Skip to lesson content

Lesson 12 / 14

A journal as evidence about an edge

Assess costs, sample quality and strategy versions rather than win rate alone.

Educational examples only. No guaranteed profit or permission to trade a particular product.

Educational scope and risks

Education only, not personal investment or trading advice. Every example price and amount is hypothetical. Derivatives, leverage, options and crypto can cause serious financial losses. Check local law, contract specifications and current fees.

100%

Learning progress

Explanation

A proposed journal template records setup ID, instrument, session, bias, sources, planned entry/stop, actual fills, gross/net P&L, R, fees, funding, screenshots, violations and review. Separate results by strategy version. This does not assert that every field is present in the app.

Worked example

Suppose 40% wins averaging 2R and losses averaging 1R give gross expectancy +0.2R per trade before fees, assuming only wins and losses.

Practice task

Write 10 hypothetical trades for each of two strategy versions. Review R, compliance and fees without real money.

Key insight

Combine win rate, average win/loss and costs to estimate historical expectancy. An apparent edge in a small sample can be noise; past performance is not a guarantee.

Common mistake

A high win rate does not ensure positive expectancy.

Evidence and assumptions

Use these sources to read up on the basics. Prices, calculations, demo exercises and journal rules here are hypothetical or author-created; they are not source-validated trading strategies. Exchange/broker terms and local rules can change. Check formula units and contract scope. Course-defined chart labels or driver maps do not establish profitable strategies.

Sources and further reading

Lesson quiz

Pick one answer per question. Then check your answers to see what you got right and what to revisit.

2 Questions
1With 40% wins, average win 2R and average loss 1R, what is gross expectancy under win/loss-only outcomes?
2What matters when investigating an edge?
Check your answers when you’re ready.

Practice calculators